Discover sustainability events happening across the Monadnock region.
The town of Winchester installed their first solar array at the Winchester Wastewater Treatment Plant. The 297-kilowatt array — installed by Brentwood-based ReVision Energy — is estimated to produce nearly 390,000 kilowatt-hours of solar electricity annually, according to a news release from ReVision Energy.
Winchester is celebrating the new installation at a ribbon cutting Monday at 2 p.m. at 64 Duso Road. The public is welcome to attend.